Case studies

Proof from the plant floor

What changed on the plant floor with Helious, and the numbers behind it.

Steel · Gorakhpur, Uttar Pradesh · TAT Guard

Gallantt Ispat Limited logo

How Gallantt Ispat automated the truck cycle at its Gorakhpur plant and cut turnaround time by a quarter.

↓25%Truck turnaround time
12 → 0Operators per shift
Read the case study

Results are estimates verified by Gallantt Ispat.

Run a plant like this one?

Book a 30-minute walkthrough with our solutions team and get a tailored readiness assessment for your operation.